Episode 32. An open mind is foundational to improvement

Incremental: The Continuous Improvement Podcast - A podcast by Devin Bodony - Wednesdays

Categories:

In this episode Devin and Uriel talk about some of the improvments they made over the past week and the thinking behind each. 8 Lean wastes - Over production, Over Processing, Excess inventory, Defects, Transportation, Wasted motion, Waiting, Wasted human potential Some of the improvements include: - Pneumatic Assembly Jigs - Generic Setup Point and Call - Air system optimization - Forklift purchase - Multi tooth threadmill testing - New trunnion design to reduce setups - Tool life monitoring Please follow us on Instagram and share your improvements and tag us.www.instagram.com/incrementalci In this podcast we discuss concepts from Lean Manufacturing, the Toyota Production System, and general business management to improve our businesses. Thanks for listening! Please drop us a note with any and all feedback! If you have parts you need machined, reach out to [email protected] and follow on Instagram www.instagram.com/lichen_mfg If you need CNCed Buckles, check out www.austeremfg.com and follow at on Instagram www.instagram.com/austere_manufacturing